| Sector | abcPower Plant | Tender Value | N.A. | Location | Tamil Nadu - India | Ref.No | 23140846 | Closing Date | 11 - Jul - 2017 | | | Supply of 8000 of 8.00 m (WI-140 kg) PSC poles for erode region. supply of 4500 nos of 9.00 M (wi-300 KG) psc Poles For Erode Region. Conversion of existing 33 KV OH line of korathur – menambedu feeder by laying of 33 KV, 1x630 sq.mm, XLPE UG cable from korattur 230/110/33 KV SS to menambedu 33/11 KV SS. fire extinguishers ands its spares (various types & capacities). procuremenrt of 11KV, 33KV and 110 KV outdoor current transformers with different rations. supply of tri choloro Iso cyanuric acid – 10 MT and sodium di chloro iso cyanurate-2 MT. supply of alooy cast iron of 200 NB & 250 NB pipes. civil maintenance circle – providing coping concrete in boiler and mill plant columns un unit-I & II. CH{ & FB – fuel oil pump house – removal of sediment of remaining heavy furnance oil, oil skedges and sediments in the HFO tank-I by manuallu and pouring in to the new HFO tank of NCTP-II. E-procurement of expansion bellow for mill hot air duty style I & IV. 300 NB & 250 NB MS ERW pipes and bends for over flow water line in bottom ash handling system. 1/10, 7/11, 7/12 SWG GI standed wire. labour charges for fabrication, erection of equipment and supplu of MS materials MS channel, MS angle for proposed switching station at sannathupudukudi 110 KV SS in tirunelveli distribution circle. labour charges for providing foundation plinth for structure and equipment etc supply fabrication and erection of RSJ poles etc at samayanallur 230/11 KV sub station (230 KV side) in madurai operation ciricle. labour charges for providing foundation plinth for structure and equipment etc supply fabrication and erection of RSJ poles etc at samayanallur 110/33-11 KV sub station (230 KV side) in madurai operation ciricle. design, detailed fabrication, engineering, manufacture, supply, erection, testing and commissioning of 230-110 KV AIS sub station with associated auto transformers, switchgears, accessories, control panels, substation automation system, construction of control room with civil works complete at thirupattur in vellore region and 1 no 230 KV bay extension at palvadi 400 KVSS, conducting detailed survey, profile plotting and submission of profile with crossing drawings, manufacture, supply of materials, erection of towers, stringing of 03 nos zebra conductor and 1 no OPGW, testing and commissioning of 230 KV SC line on DC towers from the proposed palavadi 400/230 KVSS to thirupattur 230/110 KVSS to a route length of 75 km under turnkey contract. dismantling of existing tower providing sub setting, concreting, supply, erection of towers and restringing of 02 nos MD + 12 m tower for increasing vertical clearance of existing athipatti – L&T 110 KV line and thipattu- chettinadu – SICAL 110 ka line for the constrction of pipe conveyor for the proposed 2x660 MW SEZ thermal project at ennor. ETPS expansion project – coal pipe conveyor – increasing vetical clearance- stub setting, concreting, supply and erection of towers, stringing and dismantling the existing tower for re-routing of 110 KV DC line from (dismantling portion from 230/110 KV SS to location 19) ETPS to manali (dismantling portion from 230/110 KV SS to location 11) fouling in pipe conveyor alignment and ash silo of ETPS expansion (reach II) location 5 to 6. ETPS expansion project – coal pipe conveyor – increasing vetical clearance- stub setting, concreting, supply and erection of towers, stringing and dismantling the existing tower for re-routing of 110 KV DC line from (dismantling portion from 230/110 KV SS to location 19) ETPS to tondiarpet (dismantling portion from 230/110 KV SS to location 11) fouling in pipe conveyor alignment and ash silo of ETPS expansion (reach II) location 4 to 6. ETPS expansion project – coal pipe conveyor – increasing vetical clearance- stub setting, concreting, supply and erection of towers, stringing and dismantling the existing tower for re-routing of 110 KV DC line from (dismantling portion from 230/110 KV SS to location 19) ETPS to tondiarpet (dismantling portion from 230/110 KV SS to location 36 & 37) fouling in pipe conveyor alignment and ash silo of ETPS expansion (reach I). ETPS expansion project – coal pipe conveyor – increasing vetical clearance- stub setting, concreting, supply and erection of towers, stringing and dismantling the existing tower for re-routing of 110 KV DC line from (dismantling portion from 230/110 KV SS to location 19) ETPS to tondiarpet (dismantling portion from 230/110 KV SS to location 36 & 37) fouling in pipe conveyor alignment and ash silo of ETPS expansion location 3 to 4. supply and erection of RS joint, MS channels, MS angles, MS flats, MS rod, erection of structure, earthmat, earth raisers, earth bore, stringing of 230 KV & 110 KV strung buses, dropper & jumpers, bus bars, erection of C&R panels at new control room, laing of control cable and end termination |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|