| Sector | abcPower Plant | Tender Value | INR 3 Lakhs | Location | Tamil Nadu - India | Ref.No | 85611171 | Closing Date | 23 - Jul - 2025 | | | Execution of contract for Execution of contract for Eos to 1No Tatkal sc to Thiru - Excavation of Pole pits poles, Erection of poles, Hard rock requiring Blasting and chiseling, Transporting of poles, Loading and Unloading of poles, Concreting of poles, Coping of pole, Concreting of stay, Coil earthing per pole & pole earthing, Excavation of stay pit with transporting of materials, Erection of stay set, Loading and unloading charges, Fixing of V & Channel cross arm, Fixing of LT cross arm, Fixing of HT LT TI fitting, Erection of HT Side arm with stud,
Fixing of insulator, Fixing of 11KV Disc, Fixing of Tapping channel Cross arm, Stringing, Sagging, binding including transporting of materials, Line clear works, Guarding per span length- Spilt Neutral Guarding, Fixing of one earthing device with stud, Erection of transformer/dismantling, Erection of centre support (Including concrete), Erection of Metering set, Erection of feeder cable with open type fuse unit, Erection of feeder cable -Bus bar arrangement, Loading & unloading of Distribution transformer, Plinth work for 500KVA DT with construction material, Fabrication , erection and excavation for centre support,
Tube light erection, Painting of Sc Number including Painting, Manufacturing of clamp,
Alteration of clamps, Street light switching point arrangement, Drilling / Less than 23mm holes per hole /slotted holes, Cutting of channel, Cutting of Flat, Cutting of Angle, RSJ pole cutting, Tubular pole cutting, Rail pole cutting, Fabrication of lightning arrestor frame,
LT-Changing of pin point to cut point, HT-Changing of pin point to cut point, Erection of service connection materials, Dismantling of deteriorated poles with concrete, complete replacement of worn out earth wire per structure, Labour for manufacturing of open type fuse unit, Manufacturing of HG fuse stool incl. materials, Tree clearance in HT or LT location- Throng bushes & trees, Painting, Numbering of poles, Transformer, Writing in seating channel, Painting of RCC Structure poles, Set right of leaning HT pole/LT pole including x arms, TI fittings, Transformer structure erection - Excavation of structure pole pit,
Concreting of stays, Erection of Structure materials-Top Channel, Erection of Structure materials-Transformer seating channel and belting angle, Erection of Structure materials-AB switch, Erection of Structure materials-HG fuse, Erection of Structure materials - Jumpering,
Erection of Structure materials- HT LAS, Erection of Structure materials- LT LAS, Erection of structure materials -Transformer LT cable wiring / LT Bus Bar, Erection of LT Open type fuse unit including cable jumberingincluding cutting welding bending , fabrication, Earthing system - Excavation of 4 Nos. earth pits, Excavation of earth wire, trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las, Mason works with bricks, Spreading yard jelly and cut stone and bricks including material, Transporting of Structure material, Fixing of Danger Board, Erection of Tapping structure - Excavation of structure pole pit, Erection of structure pole, Excavation of stay pit,
Erection of stay set, Concreting of structure poles, Concreting of stay (2Nos), Erection of Structure materials-Top channel, Erection of Structure materials-AB switch (complete),
Erection of Structure materials, Colour coating on poles with iron materials including paint and distember, Fabrication of 42' Twin RSJ pole Material, Excavation & Erection of fabricated RSJ pole, Concreting of RSJ pole, Resagging of various conductor, Dismantling of pole, Dismantling of stay set, Replacement of stay rod, Replacement of RSJ/Tubular poles, Dismantling of detoriated cables, Replacement of earth pipe replacing of corroded earth pipe and renewal of earthing, Mass Concrete for poles, Sleeve Concrete, Providing of Spacers, Hiring of JCB, Hiring of Crane, Excavation of structure pole pit by using JCB or Manual, Erection of AB switch, Erection of H.G. Fuse (3Nos), Structure earthing complete,
Fixing of MCD Box, Lighting arrestor fixing, LTCable arrangement, Fixing of Danger board. |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|