Product Detail :
|
SIDE WALL AND ROOF EMU C . * ONE COACH SET OF STAINLESS STEEL SIDE WALL AND ROOF FOR STAINLESS STEEL 3 PH
ASE AC EMU TRAILER "C,C2,C3,C4,C5 & C6" COACHES (MRVC PHASE II) TO DRG.NOS. (ICF/MRVC/C/BT)
57314100, ALT-"NIL" COL-I =1 NO, (ICF/MRVC/C/BT) 57316029, ALT-"NIL" COL-I =1 NO. SCHEDULE OF
TECHINICAL REQUIREMENT TO SPECN.ICF/MD/SPEC.200,ISSUE STATUS-01, REV 04, AMENDMENT NO-01
. Special Condition -LOOSE ITEM OF AIR DUCT SUPPLIED MUST BE ASSEMBLED BY THE FIRM AT ICF. AN
NEXURE A DT.22/08/2012 TO BE FOLLOWED -PACKING CONDITION AS PER ICF/J&T/MISC-2402, ALTb. [
SAFETY ITEM] [ Warranty Period 30 Months after the date of delivery ]
[Quantity Tolerance (+/-) 5 %age , Item Category Normal , Total PO value variation
Permitted Max 8 lacs ] ]
|