Product Detail :
|
Supply / installation / erecting / commissioning of Machinery & Equipment for the Common Facility Tunnel Kiln to be revamped / set up at The Tunnel Kiln A Shed SIDCO Industrial Estate for Ceramics Kiln Furnace Steel Packing Supply of Steel Structural / Plate material for Pre-Heating Zone Casing, Burning Zone Casing, Blower Main Motor - 20 HP (Impeller with 44" water Column), 2800 To 3200 RPM and Air Pipe line equipment and Pipeline with fittings for Tunnel Kiln (Addition), Supply of latest 10 Nos. DUAL Burners with in built Auto Ignition system., Addition for Modernization Supply of Auto Ignition System for Total Tunnel Kilin Burning System, By new Designing & Modification, Supply of One No. Entrance Blower - 3 HP, (Impeller with 4" water column), By new Designing & Modification, Supply of One No. Exhaust Blower - 7.5 HP, (Impeller with 3" water column), By new Designing & Modification, Supply of One No. Cooling Blower - 7.5 HP, (Impeller with 4" water column), By new Designing & Modification, Supply of One No. Exit Blower - 5 HP, (Impeller with 4" water column), Supply of Steel structure for 5 Nos. Blower support, Supply of Chimney & Steel Structure for Ducting along with support Total Setup, Supply of Oil / Gas pipe line with fittings (In House - from wall to kiln), Main Control Panel Change over Switch with Acc / Blower Motor Control Panel with Acc Supply of Auto Ignition system & Control Panel along with all gadgets Thermocouples Indicators etc. & Two Nos. of Burner Management Panel Supply of Refractory & Insulating Materials For Pre-Heating Zone & Burning Zone for Tunnel kiln Structure, Oil Tank Refurbish charges, Oil Tank Valve control, Oil Tank Level Control, Oil Tank Pipeline fittings, Oil Tank Gear Motor - 3 HP, 1440 RPM, Oil Tank Gear motor Section Unit, Installation of Gas Firing System and Pipe Line Up to the Kiln Shed With Cylinders & Vaporizer Unit as advised by IOC / Indane, Gas Tank Control valve and connecting Points, Gas Tank Pipe line fitting with control and Pressure Gauge Valve, Gas Tank Safety Measuring Tools at Gas Yard, Supply / Refurbishing of Hydraulic Power Pack for Pusher Unit for Tunnel Kiln, UG Cable 25 SQ mm, Flexible 4 Core Copper Cable, Earth Cable with copper Plate, 2.5 Sq. mm Cable, LED Light Fitting, Installation Cost for Electrical Work, Switch Gears, Cutouts, Starters, Switches, Fans etc, Supply of Wheel & Axle along with Bearing & machining for Tunnel Kilin Trolley And other Casting items ", Supply of Steel Structural / Plate material for 70 Nos. Trolley & 2 Nos. Transfer Trolley, Tunnel Kiln 70 Nos. Trolley Relining by Refractory / Insulating material & Furniture, Dismantling and removal of old refractory of Pre-Heating Zone Casing, Burning Zone & Casing, TOTAL Erection & Commissioning For Tunnel Kilin By Expertise with their Technicians & Skilled Work Force, Fabrication & Erection for Tunnel Kilin Structural Work (Pre Heating zone & Burning Zone) and 84 Nos. Trolley Modification work, Tunnel Kilin refractory & Insulating Materials for relining of pre heating zone. Burning zone & 84 Nos Trolley, Erection of Burning System Air Handling Equipment Pusher Trolley wheel & axle & Control panel along with Cable (Tunnel Kilin only), etc.
|